• Tidak ada hasil yang ditemukan

solomon8rev. 203KB Jun 04 2011 12:09:32 AM

N/A
N/A
Protected

Academic year: 2017

Membagikan "solomon8rev. 203KB Jun 04 2011 12:09:32 AM"

Copied!
12
0
0

Teks penuh

Loading

Gambar

Figure 1: (a) A Dyck path of length 12 from (0, 0) to (12, 0), having exactly two contact points–thestarting point and the finishing point
Figure 2: The Dyck path P on the left is in D1((0, 1), (9, 2)), having (1, 0) as a unique contactpoint
Figure 3:The Dyck pathcontact point–(8rise-steps P at the top is in D4((0, 1), (13, 2)), and has four contact points:p1 = (3, 0), p2 = (5, 0), p3 = (7, 0) and p4 = (11, 0)
Figure 4: (a) The Dyck path P is in D3((0, 0), (10, 0)), and has three contact points: p1 = (0, 0),p2 = (4, 0) and p3 = (10, 0)

Referensi

Dokumen terkait

Berdasarkan tabel 14, dapat dilihat persentase terbesar hambatan infrastuktur berada dalam kategori sedang, dimana pengusaha mikro dan kecil pada sektor informal di

Suksesor yang kini menduduki jabatan sebagai Direktur Utama perusahaan yaitu Narasumber-2 dipilih oleh FBL sebelumnya (Narasumber-1) beserta para pemegang saham dalam

Berdasarkan Surat Kuasa Pengguna Anggaran Kegiatan Pengembangan dan Pengelolaan Daerah Rawa Dalam Rangka Pengendalian Banjir Kota Banjarbaru Nomor : 610/ 01/ RPJI -1/ DPU&P/

Disebutkan bahwa tujuan laporan keuangan lembaga keuangan syariah pada dasarnya sama dengan tujuan laporan keuangan konvensional (Wirang, 2012), meskipun terdapat

PEMERINTAH KABUPATEN TANAH BUMBU SEKRETARIAT DAERAH.. UNIT

Pada hari ini Sabtu tanggal Tiga bulan Juni tahun Dua Ribu Tujuh Belas (Sabtu, 03-06-2017), pada pukul 10.00 WIB s/d 11.00 WIB, kami yang bertandatangan dibawah ini

Tujuan dari desain basis data ini adalah untuk menentukan data-data yang dibutuhkan dalam sistem, sehingga informasi yang dihasilkan dapat terpenuhi dengan baik. Perancangan

[r]