• Tidak ada hasil yang ditemukan

The Technical and Business Analysis of Using Shore Power Connection in The Port of Hamburg

N/A
N/A
Protected

Academic year: 2018

Membagikan "The Technical and Business Analysis of Using Shore Power Connection in The Port of Hamburg"

Copied!
6
0
0

Teks penuh

Loading

Gambar

Figure 4. Cable management system using robot arm by Stemmann  Technik
Figure 7. Block diagram of HVSC system arrangement on cruise ship

Referensi

Dokumen terkait

Umaedi (2000:24) menjelaskan bahwa : Faktor pertama, kebijakan dan penyelenggaraan pendidikan nasional menggunakan pendidikan education production function atau

For this coupe, it is clear that for the total extent of soil disturbance, current harvesting and regeneration practices are unlikely to meet the operating standards proposed under

19.2 Penghentian kontrak dilakukan karena terjadinya hal-hal diluar kekuasaan (keadaan kahar) kedua belah pihak sehingga para pihak tidak dapat melaksanakan kewajiban yang

(5) Kepercayaan pelanggan mampu memberikan pengaruh kepada loyalitas pelanggan, sehingga jika pelanggan percaya maka akan semakin meningkat loyalitas pelanggan.(6)

Puji syukur kehadirat Tuhan yang Maha Kuasa, karena berkat restuNya makalah ini dapat diselesaikan tepat pada waktunya. Budaya sebagai benih identitas suatu bangsa

Penelitian ini secara umum bertujuan untuk memperoleh gambaran yang jelas mengenai pelaksanaan tugas guru sebagai pendidik di Sekolah Menengah Kejuruan (SMK) Negeri

Pada tabel diatas dapat kita lihat bahwa nilai kalor tertinggi pada temperatur karbonisasi 550 o C pada komposisi 75% BK : 15% PP dengan nilai kalor sebesar 7036

[r]